Monday, January 11, 2010

Tuesday, January 5, 2010

January 5, 2010

 

IMG_3149w

Above, Mike Long and Don McDougal (Turner) watch as architect Dan Weese examines stone samples submitted by Mike VanEtten of Murphy Marble Co. (checked shirt).  The existing stone floor in the 1st floor corridor, which we are restoring, is paved with Tennessee Marble (color: Quaker), as are the two stairwells.  The south stair (see photo below) will be entirely re-built and extended to reach the 3rd floor, whereas the north stair and the 1st floor flooring are being cleaned and repaired.  The 1st floor corridor walls are finished with a French Limestone.  Walls, although seemingly in good condition, actually require a lot of work to restore.  There are many cracked and loose pieces of stone.  In addition, both the stone floors and walls have to be cleaned. 

IMG_3649w

Above:  The south stair hangs by heavy steel rods.  The walls surrounding the stair have been entirely removed.

IMG_3159w

Above:  Two things going on here.  First, two portions of the 1st floor stone corridor floor and wall were cleaned using two different strengths of cleaner.  Second, several stone samples were submitted for consideration, however, all were too dark.

IMG_3666w

Above: A pallet of loose and damaged French Limestone pieces that were removed from the 1st floor corridor walls.  The two circled stones were submitted for consideration, but are two dark.  Another submittal is necessary.

IMG_3658w

Above:  Dreaded review marks on a shop drawing.

Shop Drawings?  What are those?  Glad you asked.  The contract between Northwestern University and the contractor is based on a set of drawings and specifications.  The specifications require that the contractor submit, for every component, certain information to the architect for review to assure compliance with the contract documents.  Generically, this information is referred to as “shop drawings,” primarily because much of this information is submitted in the form of detailed, scale drawings.  Sometimes such submittals consist of nothing more that a simple catalog sheet.  Others involved dozens of large drawings.   The shop drawing process also serves as the vehicle for making material and color selections.  In the case of stone, for example, detailed drawings are submitted, showing the profiles of every stone, as well as a range of stone samples from which selections are made for actual installation. Often, shop drawings are approved on the first submittal.  Sometimes, it takes several submittals before everything is confirmed to be correct.  On a project of this scale there are many shop drawings.  At this point, I have four “banker’s boxes” filled with shop drawings.  See the next photo:

IMG_3588w

Above:  One of four boxes of shop drawings in my office.  Among the shop drawings are “coordination drawings,” which are drawings that several trades must accurately identify their work within the context of the work of other contractors.  These usually include the work of the electrician, plumber, pipe fitter (heating & cooling), and tin knocker (ventilation ductwork made from sheet metal).

IMG_3584w

A January 4, 2010 meeting with the Building Committee to review carpeting samples.

IMG_3138w

Above: Carpet samples.

IMG_3144w

Above: A typical faculty office has been defined by steel studs.  The plywood will support bookshelves.  Note the progress of the electrician (conduits and junction boxes within the stud walls).

IMG_3657w

Looking up, in a faculty office, at the “chilled beam,” which delivers, depending on the season, either warm or cold air to individual offices. This design affords a remarkable degree of temperature control for occupants.  Note the insulation within the exterior wall studs (lower left corner of the photo).

IMG_3650w

“Rock wool” insulation.  It’s green in spite of the fact that it appears brown.

IMG_3590w

New concrete walls define the accessible ramp at the north side of the building.  These will eventually be clad with stone.

IMG_3592w

West elevation:  Note the opens that have been cut through the concrete foundation wall.  This will accommodate ductwork and piping between the new subterranean mechanical room (foreground) and the lower level.

IMG_3594w

New subterranean mechanical room, viewed from the south.

IMG_3646w

Working in the new mechanical room.  The large tube to the right of the hardhat in the sump pit is one of two temporary braces that will eventually be removed.

IMG_3600w

The new Classroom L-07.  The floor is stepped to provide superior sight lines of the instructor.

IMG_3603w

Workmen erecting a temporary scaffold between between the 2nd and 3rd floor. (1-5-09)

IMG_3613w

3rd floor (1-5-09)

IMG_3627w

The red arrow is pointed at a portion of a window jamb that still has the original stain and varnish finish.  The yellow arrow below it points to a jamb that is partially stripped.  The left arrow points to a mullion that has been stripped to bare wood.  The process is slow and laborious; yet slower in cold weather. 

IMG_3634w

Temporary steel supports to facilitate installing a beam.

IMG_3643w

Creative version of job-built saw horses.

IMG_3638w

It’s the end of the day. 

Sunday, November 15, 2009

November 12, 2009 Update

IMG_0809w

Some of the concrete walls have been poured.  The structure in the left foreground is an air intake.

 

 IMG_0835w

IMG_0823w 

Preparing to pour footings.  The concrete is delivered from the concrete truck via a chute to wheelbarrows and then manually placed.  The grid between the form boards is iron rebar that are tied together with steel wires.  This serves to reinforce the concrete.

 IMG_0848w

Lower level has been backfilled with “CA-7",” which is a graded crushed stone.  That is, the stone are of relatively uniform size.  What looks like Kraft paper laid over stone, is actually a product called Cetco Ultraseal.  This is a multilayered waterproofing material that combines natural sodium bentonite and a chemically resistant hydrophilic polymer to form a bentonite-polymer alloy (BPA).  The is material has swelling properties that seal small concrete cracks.  The “paper” is simply overlapped. 

IMG_0847w

Electricians installing conduits under L-107.

IMG_0860w

Cioni Excavating crane rest atop a massive pile of earth at the southeast corner of the site.

IMG_0857w

2nd floor:  Note copper heating and cooling piping along the brick wall in the background.  Metal studs, that define the walls, in the foreground.

IMG_0864w

Architect Dan Weese photographs wood windows on the east side of the 2nd floor.

IMG_0863w

The 95 year old window frames are being carefully stripped of layers of paint.

IMG_0867w

After all the paint has been stripped, the wood will be treat with a special epoxy product that will fill any gaps, sanded smooth and repainted.

Thursday, November 5, 2009

Building the west basement

The west basement will house the bulk of the mechanical equipment that will serve the building.  Although it is difficult to perceive it in a photo, the excavation is quite deep:  Two stories (20 feet). The adjacent earth, which is very sandy, is held back with steel sheets driven into the ground.  The large, horizontal steel tubes, called whalers, serve to keep this temporary steel “wall” from buckling inward.  The bottom of the excavation is inches above the water table.  What appear to be walls (some spray painted blue) are forms that define the foundation wall.  After the form construction is completed, which includes the steel reinforcement within them, the void between the forms will be filled with concrete.  Many, many truckloads of concrete.  After the concrete has hardened, the forms will be removed (“stripped”) and the new foundation walls will be visible.

When completed, the mechanical room will be entirely subterranean, topped with a new set of stairs, an entry plaza and landscaping.

IMG_0617w

I shoot with my camera set to record at 9 megapixels and the image files range from about 3,500 to 5,500 pixels in width, depending on the amount of detail and color in the subject.  I normally reduce the image size to 1,000 pixels wide and format the image for viewing on the web.  i.e. so the images load quickly.  However, I really like the amount of detail in the following image, so posted the original image size(3,456 x 2,592 pixels), however, optimized for faster loading.  Click the image to see the steel (“rebar”) between the forms.

IMG_0618w-full-size

The next photo shows the south end of the building.  The foundation wall below the existing fireplace in “the treaty room” (Room 108) has been reinforced with steel and the foundation wall opened.  A second basement will be constructed on the south end of the building and the opening in the foundation wall will be part of a new corridor.

IMG_0620w

Monday, November 2, 2009

Carpet

Away from the dust and noise . . . an afternoon at the Mart selecting carpet.

Thursday, October 15, 2009

August - September

IMG_72702w

There has been a great deal happening at Harris in the last two months and the site has been overrun with equipment and simmering with activity.  One day, in August, I counted twelve pieces of machinery on site.  i.e. backhoes, telescoping booms, cranes, etc.  Most of it was in use! 

IMG_7437w

This time there are two movies documenting the activities at Harris Hall, plus a bonus video.   Dan Weese and I have been talking about congas and bongos (see separate posting on this HERE), so when we heard drumming just outside the construction fence, we had to investigate.  The bonus video, called BOOMSHAKA (after the drumming group) documents what we discovered beyond the fence.  Enjoy.

The BONUS video:

Thursday, August 6, 2009

June-July

IMG_5795w

The image above shows the massive built-up steel beam (four feet high!) that spans above the auditorium (a.k.a. room 107).  This beam carries the (rather significant) load of the building above.  Impressive.

My last posting, I learned from two friends, was blocked from viewing in China.  Evidently these Harris Hall updates are either too controversial or subversive; hopefully not blocked after a qualitative review.  It brings the image to mind of a person similar in disposition as the listener in “The Lives Of Others.” This post is dedicated to that person, should he/she exist, and comes with a personal message:  “Go ahead, let it be.”  The following short movie, certainly to be blocked as well, is a synopsis of the activities at Harris Hall during June and July.  Turn up the volume good and loud!