Thursday, December 23, 2010

September 2010

Fresh concrete at the north entrance.

Bluestone paver installation in progress at the new south terrace.

Room 107, above, is nearly ready for carpet installation.

Carpet partially installed in Room 107.  Dan Weese and Don McDougal contemplate . . . something.

Trying to figure out the mistake in the subcontractor’s calculations for the rise and run at the north stair.  From left, Anthony Douglas, Don McDougal, Dan Weese, Ron McAllister.

 

Installing the concrete sidewalk east of Harris Hall.

P1000390G

Installation of stone at north entrance stair.

P1000391H

Yellow underpainting at the first floor ceiling, in preparation of multiple glazes of pigment.  The resulting faux painting finish will result in an appearance that is convincing.

P1000392I

Stone cleaning in progress.

P1000403J

Hmm. Blackboard covers window.  How did that happen?

August 2010

P1010063Q

Room 107 – painting stripping and ceiling work in progress.

P1010064R

Marble floor installation in progress at the lower level.

IMG_9466F

Room 107 – all the wood is stripped of numerous coats of paint.

IMG_9492H

Stair no. 2

IMG_9493I

IMG_9494J

A marble stair tread awaiting installation.

P1000172M

Faculty Lounge – secret floor leveling code.

P1000189N

P1000219O

Fretting over the carpet border layout.

P1000241P

Mechanical room.

IMG_0003A

IMG_0014B

IMG_0016C

IMG_0018D

IMG_0021E

Installing waterproofing system on the plaza and stairs.

Underlayment at the new, larger stage in Room 107.

Stone for the exterior stairs and plaza.

July 2010

Work stopped during a 20 strike.

Meeting to discuss keying.  From left, Dan Weese, Paula Blaskovitz, Phil Sanders, Tony Hicks.

Door delivery.  Curious forklift moves without turning.  i.e. it will move sideways without turning at all!

June 2010

 

Weekly meeting.

 

Harris 107, above.

The schedule . . . before the strike.

Superintendent Ron McAllister.

Selecting marble flooring for the lower level.

Dan Weese and I test the seating mock-up in Harris 108.

Elevator rails await installation.

The new elevator shaft.

Assembling the elevator cab.

Assembling the elevator

Unloading a window delivery.

Faculty Lounge in construction.

Beginning to install forms for the new stairs serving the lower level.

 

A few spools of the many miles of wiring in Harris Hall.

Painstaking work . . . stripping years of paint away in Harris 107.

Forming stairs continues.

Freshly poured concrete stairs.

Troweling fresh concrete.

Installing windows.

Installing drywall at the 3rd floor.

Wood trim at offices.

May 2010

The new stair connecting the 2nd and 3rd floor.

 

Top of the new stair (Stair 2).

Scaffolding encircles Harris Hall to facilitate facade restoration.