Sunday, February 21, 2010

February 17, 2010

Above, cutting metal decking for the auditorium stage.

Don McDougal II (Project Manager) and Ron McAllister (Superintendent) at the field office in Room 108.

Concrete deck and stairs serve as the roof for the new mechanical room on the west side of the building.  They will get covered with a waterproof membrane and stone.

Field trip to pick stone for the 1st floor corridor.

The color coded edges of slabs of stone.

The future administrative office of the Department of History.

2nd floor, looking south.

3rd floor, looking south.

East side of the 3rd floor, looking south.

South end of the 3rd floor, at the stairwell opening, looking north.

Looking into the south addition.  The Center for Historical Studies will be situated in the foreground.  The Department of History Seminar Room will be located in the far corner.

Steelworker prepares steel rebar reinforcement.  The plywood “boxes” are forms for windows.

Plumbers at work in the Lower Level.

Temporary moisture protection over the west addition.

 