Above: Last year, chilled water piping was re-routed around the future basement mechanical room addition on the west side of the building. Now the re-routed piping is being connected to the building.
Don McDougal II provides a bit of shadow so we can evaluate the latest mortar mock-up.
Dan Weese gives the mortar mock-up the “thumbs up.” The masonry contractor will be relieved.
Above: Shelving mock-up in a typical faculty office. The mismatched file cabinets were installed to confirm that a variety will fit under the bottom shelf.
Opposite of the wall of shelving (previous photo), a U-shaped desk will slip in between the wood uprights.
Mock up of a window and frame.