March 30, 2010

 

 

Above:  Last year, chilled water piping was re-routed around the future basement mechanical room addition on the west side of the building.  Now the re-routed piping is being connected to the building.

Don McDougal II provides a bit of shadow so we can evaluate the latest mortar mock-up.

Dan Weese gives the mortar mock-up the “thumbs up.”  The masonry contractor will be relieved.

Above:  Shelving mock-up in a typical faculty office.  The mismatched file cabinets were installed to confirm that a variety will fit under the bottom shelf.

Opposite of the wall of shelving (previous photo), a U-shaped desk will slip in between the wood uprights.

 

Mock up of a window and frame. 