Room 107 – painting stripping and ceiling work in progress.
Marble floor installation in progress at the lower level.
Room 107 – all the wood is stripped of numerous coats of paint.
Stair no. 2
A marble stair tread awaiting installation.
Faculty Lounge – secret floor leveling code.
Fretting over the carpet border layout.
Mechanical room.
Installing waterproofing system on the plaza and stairs.
Underlayment at the new, larger stage in Room 107.
Stone for the exterior stairs and plaza.