Thursday, December 23, 2010

December 2010

IMG_1649B

Harris Hall awaits the return of students and the start of classes on January 3, 2011. My step daughter, Julia Smith (2011), a history-econ major, will be among those enjoying the newly renovated building, so it was particularly sweet to have been assigned to this project.  There are still several hundred loose ends to trim and finalize, but over all, the project is complete and the building occupied.  The project, being a mix of new construction, historic restoration, rehab, and designed for LEED certification, was demanding, interesting, compelling and downright thrilling.  I thoroughly enjoyed working with the faculty and administrative staff in both the Department of History and the Nicholas J. Chabraja Center for History Studies.  It was a particular pleasure working with Weese Langley Weese, and especially Dan Weese, whose passionate and relentless attention to the project permeates the building.  I wholly appreciate the commitment and efforts of Turner’s construction team (Mike Long, Don McDougal, Ron McAllister and Anthony Douglas) and the many trade contractors that worked on the project.  Of course, the project success was underpinned by a host of consultants, contractors, vendors, Facilities Management staff, and other University Departments, such as Academic Technologies, NUIT, Block Museum, NU Police.  Thank you to everyone for your help.  Harris Hall should be good for yet another century.   -John Brzezinski

IMG_1650C

View from the southeast.

IMG_1643A

Architect Dan Weese rests, with Mr. Norman Waits Harris looking over his shoulder.  What would Mr. Harris think of all this?  I should think he would be pleased.

November 2010

P1000766G

Above, Vasco, the painter, is the victim of an terrible accident.  The good news was that he was wearing his hardhat, which saved his life.  A section of cast iron baluster fell three stories and landed on this head.  It shattered on impact, but his hardhat only suffered a scratch.  Unfortunately, a piece of the baluster was deflected to his neck/shoulder, which resulted in a deep cut.  Miraculously, Vasco recovered within days and was back at work in less than two weeks. 

P1000773I

Stunned workers stare in disbelief at the shattered pieces of cast iron.

P1000769H

Close-up of the shattered cast iron baluster.

JBrzezinski_P1000928_12220E

Faux painting in progress the 1st floor corridor ceiling.

P1000826J

Faux painting in progress at the stage in Accenture Forum (Room 107).  In this photo you can see the yellow underpainting with a layer of glaze covering it various places.

JBrzezinski_P1000925_12217D

Faux painting finished.

JBrzezinski_P1000947_12247F

The “palace rug” returned to Harris 108 after being cleaned.

October 2010

The floor in Room 108:  Replacing select pieces of the floor.

Room 108 floor pattern

Floor pattern of the oak floor in Room 108.

Chair installation in progress in Room 107.

P1000515C

Dan Weese and Anthony Douglas discover their common interest in fashion.

P1000516D

The decorative molding installed at the new ceiling of Room 108.  The ceiling appears to be a standard plaster, but in fact is a high tech material, imported from Switzerland, with acoustical properties.

P1000606E

Lower level.

P1000623F

First floor.  The balusters and railings incomplete.  Hmm.

September 2010

Fresh concrete at the north entrance.

Bluestone paver installation in progress at the new south terrace.

Room 107, above, is nearly ready for carpet installation.

Carpet partially installed in Room 107.  Dan Weese and Don McDougal contemplate . . . something.

Trying to figure out the mistake in the subcontractor’s calculations for the rise and run at the north stair.  From left, Anthony Douglas, Don McDougal, Dan Weese, Ron McAllister.

 

Installing the concrete sidewalk east of Harris Hall.

P1000390G

Installation of stone at north entrance stair.

P1000391H

Yellow underpainting at the first floor ceiling, in preparation of multiple glazes of pigment.  The resulting faux painting finish will result in an appearance that is convincing.

P1000392I

Stone cleaning in progress.

P1000403J

Hmm. Blackboard covers window.  How did that happen?

August 2010

P1010063Q

Room 107 – painting stripping and ceiling work in progress.

P1010064R

Marble floor installation in progress at the lower level.

IMG_9466F

Room 107 – all the wood is stripped of numerous coats of paint.

IMG_9492H

Stair no. 2

IMG_9493I

IMG_9494J

A marble stair tread awaiting installation.

P1000172M

Faculty Lounge – secret floor leveling code.

P1000189N

P1000219O

Fretting over the carpet border layout.

P1000241P

Mechanical room.

IMG_0003A

IMG_0014B

IMG_0016C

IMG_0018D

IMG_0021E

Installing waterproofing system on the plaza and stairs.

Underlayment at the new, larger stage in Room 107.

Stone for the exterior stairs and plaza.

July 2010

Work stopped during a 20 strike.

Meeting to discuss keying.  From left, Dan Weese, Paula Blaskovitz, Phil Sanders, Tony Hicks.

Door delivery.  Curious forklift moves without turning.  i.e. it will move sideways without turning at all!

June 2010

 

Weekly meeting.

 

Harris 107, above.

The schedule . . . before the strike.

Superintendent Ron McAllister.

Selecting marble flooring for the lower level.

Dan Weese and I test the seating mock-up in Harris 108.

Elevator rails await installation.

The new elevator shaft.

Assembling the elevator cab.

Assembling the elevator

Unloading a window delivery.

Faculty Lounge in construction.

Beginning to install forms for the new stairs serving the lower level.

 

A few spools of the many miles of wiring in Harris Hall.

Painstaking work . . . stripping years of paint away in Harris 107.

Forming stairs continues.

Freshly poured concrete stairs.

Troweling fresh concrete.

Installing windows.

Installing drywall at the 3rd floor.

Wood trim at offices.